Fibre saturation point FSP
Fibre Saturation Point (FSP) relates to the moisture content (MC) of timber. Saturation Point (SP) may also be used with reference to other materials such as soil, but in both cases it refers to the point at which pores or cells are 'full' with water.
The FSP of timber will vary between species but it is normally accepted as averaging around 30%MC (moisture content), that being the percentage ratio of the wet wood to the theoretical weight of the dry wood. This level of MC is significant because it is considered to be the point of reasonable movement ie when wood that is significantly above this MC level dries its physical and mechanical properties change, which can lead to deformation.
Wood is hygroscopic so moisture levels can change in relation to the localised environment. As wood dries it shrinks, and as it absorbs moisture up it expands, the severity of which depends on the amount of moisture lost or gained. When wood is at the FSP of 30% further drying is less likely to cause significant deformation and it is therefore considered more stable or predictable in terms of being worked with.
The point at which timber stabilises in balance with the moisture of its own environment (which is normally below the FSP) is referred to as Equilibrium Moisture Content (EMC). This figure will vary depending on the species but more importantly with the moisture and temperature of the local environment, this hygroscopic characteristic of timber can be beneficial to internal environments when exposed internally. Fore more information see: Equilibrium Moisture Content.
[edit] Related articles on Designing Buildings
Featured articles and news
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.